Projects
Throughout these years, there are many projects in which we have participated, but two are the ones that will always be our reference. The first, the Wind-Diesel Project of San Cristóbal (Galapagos Islands - Ecuador), because it allowed us to enter this sector, and the second, the Hybrid Project of La Plana (Zaragoza - Spain) because there we managed to achieve all the challenges. that this type of projects can present today
WIND-DIESEL SAN CRISTÓBAL PROJECT (GALAPAGOS ISLANDS - ECUADOR)
The challenge was to install three 800 kW wind turbines working in coordination with the three existing 800 kVA generator sets that already served the island's loads. It was launched in 2007, and the project reached renewable penetration rates with annual averages close to 36%, reaching maximum renewable energy levels above 90%.
​
https://www.globalelectricity.org/wp-content/uploads/2022/10/Galapagos-Report-2016-Spanish.pdf
​
LA PLANA HYBRID PROJECT (ZARAGOZA - SPAIN)
Following the experience of the project in the Galapagos Islands, in 2015 the task was received to build the La Plana hybrid plant, as a test bed and showcase of this type of projects for the then GAMESA, and later SIEMENS GAMESA. .
Initially it was launched as an Offgrid plant, but later Ongrid, Weak-Grids and Virtual Power Plants modes were developed, meeting the most important challenges that this type of installations have to face here.